Project Details:
Owner: NHDOT
Location: Bedford, NH
Structure Type: Overpass Bridge
Cost: $9 million dollar
Projects Overview:
E.D. Swett was the main lead on a $9 million dollar design-build project which provided the NHDOT with a turn-key project along the busy Route 3 corridor in Bedford, NH. This project consisted of rebuilding 1.5 miles of Route 3 with a new alignment, an overpass bridge spanning the Everett Turnpike, removal of the existing Route 3 and overpass bridge, as well as laying back the ledge cut along the highway for future widening. E.D. Swett provided the entire project administration, testing, and QC/QA assurance.