top of page
Search

Route 3 Overpass Bridge

edswettinc

 

Project Details:

Owner: NHDOT

Location: Bedford, NH

Structure Type: Overpass Bridge

Cost: $9 million dollar


Projects Overview:

E.D. Swett was the main lead on a $9 million dollar design-build project which provided the NHDOT with a turn-key project along the busy Route 3 corridor in Bedford, NH. This project consisted of rebuilding 1.5 miles of Route 3 with a new alignment, an overpass bridge spanning the Everett Turnpike, removal of the existing Route 3 and overpass bridge, as well as laying back the ledge cut along the highway for future widening. E.D. Swett provided the entire project administration, testing, and QC/QA assurance.



36 views

Recent Posts

See All

Contact

8 Industrial Park Dr.
Concord, NH
03301
(603)-224-7401

NAICS Codes
Highway/Bridge/Street Construction:
237310
Other support activities for road transportation:
488490

Careers


Join Our Team Today!

Learn about our exciting career opportunities.

 

Associations

NH Good Roadds Association
agc nh.png

Follow us: f

bottom of page